Schenker Office

Location

9/2, bld. 8, Maroseyka str., Moscow

Duration

3 months

Works performed

The fit out of Shenker JSC offices included both civil works and installation of all the required engineering systems.

Office design was settled in soothing beige and brown colors. The walls were spackled and painted. The floor in the workspace was covered with laminate, same colors as the doors. The ceiling is white, Armstrong type. In the toilet the walls and floors were fitted out with ceramic tiles.

As a result, the space became neat, fit for work, comfortable and ergonomic.

Start chat